Construction Canteen — Zinc Removal + Dosing
Zinc (2× limit) and bacteria in well water resolved with ion-exchange and hypochlorite dosing.
A zinc-removal unit and a hypochlorite dosing-disinfection system were designed, built and installed for a major contractor's construction-site canteen in Pocheon. As canteen water, compliance with the drinking-water standard was mandatory.
Diagnosis
- Zinc — detected at more than twice the drinking-water limit
- General bacteria & total coliforms — present (unfit to drink)
Solution — zinc removal + dosing disinfection
Dedicated zinc-removal ion-exchange resin, with a sodium-hypochlorite dosing pump on the well-water feed line to secure residual contact time, plus safety components (pressure-reducing and check valves).

Installation & commissioning
The dosing control panel uses in-house PLC design with a touchscreen for status and setpoint entry. Well-pump interlock, charging/piping, commissioning, on-site test-strip verification and operator training completed the work.

Result
Zinc and bacteria resolved together, meeting the drinking-water standard — with in-house electrical control tailored to the site.
Diagnose your water today
Tell us your water problem and our experts will diagnose it for free and propose the optimal solution and quote.
Could it work at your site? Free consultation arrow_forward