Bicarbonate Agriculture · Cheongju

Strawberry Farm — Dedicated Bicarbonate System

Reduced 180 ppm bicarbonate (≈2× target) with dedicated resin and spare-tank redundancy.

A dedicated bicarbonate-removal system was designed, built and installed for a strawberry farm in Cheongju. Elevated bicarbonate and pH affect nutrient-solution management and crop growth, requiring a selective treatment process.

Diagnosis

  • Bicarbonate — 180 ppm, about twice the 40–80 ppm range suitable for irrigation
  • pH — elevated

Solution — dedicated ion exchange

A dedicated ion-exchange resin selectively reduces bicarbonate, with a spare resin tank for uninterrupted operation.

Dedicated bicarbonate ion-exchange vessels
Dedicated resin vessels — with spare

Installation & commissioning

The control panel and base piping were pre-fabricated in-house and assembled on site to shorten installation time and standardize quality, followed by leak/operation commissioning.

Completed system inside the greenhouse
Completed — control panel and resin vessels in the greenhouse

Result

Bicarbonate brought to an appropriate level, stabilizing irrigation-water quality.

Diagnose your water today

Tell us your water problem and our experts will diagnose it for free and propose the optimal solution and quote.

Could it work at your site? Free consultation arrow_forward
arrow_back View all case studies
call